Bear Coal Company
<br />TABLE 2 CONTINUED
<br />12 October 6, 1999
<br />NOTE: Station U19 is a ,¢5 Rebar along the access road to the
<br />portal. The point was run over by equipment between
<br />November, 1988 and July, 1989 resulting in a shift in
<br />position. Note that the coordinates up to November,
<br />1988 were consistent. The new means reflect the values
<br />of July, 1989 through September, 1994.
<br />STATION U23
<br />July, 1987 404,212.45 1,441,756.40 6143.78
<br />October, 1987 404,212.44 1,441,756.41 6143.81
<br />June, 1988 404,212.50 1,441,756.44 6143.78
<br />November, 1988 404,212.51 1,441,756.44 6143.79
<br />July, 1989 404,212.57 1,441,756.45 6143.75
<br />November, 1989 404,212.64 1,441,756.43 6143.75
<br />July, 1990 404,212.67 1,441,756.43 6143.74
<br />November, 1990 404,212.81 1,441,756.42 6143.72
<br />July, 1991 404,212.80 1,441,756.50 6143.75
<br />November, 1991 404,212.83 1,441,756.46 6143.74
<br />July, 1992 404,212.92 1,441,756.46 6143.74
<br />November, 1992 404,212.92 1,441,756.46 6143.75
<br />June, 1993 404,213.04 1,441,756.45 6143.66
<br />October, 1993 404,213.03 1,441,756.45 6143.71
<br />May, 1994 404,213.07 1,441,756.47 6143.70
<br />July, 1994 404,213.01 1,441,756.48 6143.71
<br />Sept., 1994 404,213.01 1,441,756.48 6143.80
<br />Mean 404,212.77 1,441,756.45 6143.74
<br />On October 11, 1993 UTE Engineering and Surveying established a
<br />new slope stability monitoring station. This monument is located
<br />on the hillside below the fan structure. This monument is a #5
<br />rebar with a 2-inch aluminum cap - set in concrete. This station
<br />will be referred to as U-24. The values for U-24 are as follows:
<br />Northing Fasting Elevation
<br />STATION U24
<br />October, 1993 404,398.97 1,441,948.61 6083.54
<br />May, 1994 404,401.36 1,441,947.94 6082.55
<br />July, 1994 404,401.55 1,441,947.92 6082.48
<br />Sept., 1994 404,401.58_. 1,441,947.94 6082.48
<br />Mean 404,400.87 1,441,948.10 6082.76