My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP01568
DRMS
>
Back File Migration
>
Report
>
REP01568
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:31:56 PM
Creation date
11/26/2007 10:00:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Report
Doc Name
AHR REQUIREMENTS & INFORMATION PERMIT # C-81-018
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />I J I3 Sherman St., Room 2I S <br />Denver, Culoracio A0203 <br />Phone: 13031 866-3 56 7 <br />FAX. 1703) 832 ~B 106 <br />March 15, 1995 <br />Mr. Murari P. Shrestha <br />Assistant Manager of Engineering <br />Western Fuels - Utah <br />SOS Urban Street - Suite 305 <br />Lakewood, CO 80228 <br />Re: Review of Responses to Annual Hydrology Report Review <br />Deserado Mine (C-81-018) <br />Dear Mr. Shrestha: <br />~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />fames 5 Lxhhead <br />E.ecmive Director <br />Muhael B Long <br />Dia von Duet Wi <br />The Division has reviewed your responses to our review of the 1993 <br />and 1994 Annual Hydrology reports for the Deserado Mine. Some of <br />the responses have raised additional questions or concerns which <br />are transmitted herewith. The numbering sequence below follows <br />that of the original adequacy review dated March 7, 1995 and those <br />concerns which were adequately addressed in your response are <br />omitted from this letter. <br />2c) WFU states that Table 2-1 of the AHR has been revised to show <br />that groundwater samples are analyzed for dissolved metals and <br />surface water samples are analyzed for total metals. This is <br />a step in the right direction, however, another question that <br />comes to mind is: what has actually been done in the past? <br />Were groundwater samples analyzed for total or dissolved <br />metals? <br />5) The referenced sentence speaks only in general terms to the <br />predicted impacts of subsidence on water level. Typically, <br />after a mine has been in operation for some time, and <br />observations confirm (or contradict) predicted impacts, the <br />PHC is modified to quantitatively describe observed impacts, <br />and, if relevant, quantify or refine previous quantifications <br />of predicted impacts. This is what the Division is asking for <br />here. The revision need not be a major undertaking. A <br />paragraph or two, quantitatively describing observed impacts <br />and predicting future impacts based on extrapolation of <br />observations would suffice. This will be required at the next <br />midterm review. However, if WFU wishes to address this issue <br />earlier, a separate technical revision may be submitted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.