Laserfiche WebLink
• TABLE 2 <br />HYDROLOGIC MONITORING PARAMETER LIST <br />MINES 1, 2 & ECKMAN PARK <br />lD (I) (I) <br />ALLUVIAL SPOIL SPOIL NATURAL SURFACE <br />PARAMETER UNITS WELLS WELLS WELLS SPRINGS SPRINGS WATER <br />WATER LEVEL feel S M Q - - - <br />FLOW cfs - - - M&Q(2) S M <br />TEMP., field deg. C S M Q M&Q S M <br />pH, field - S M Q M&Q S M <br />EC, field umhos/cm at 25 C S M Q M&Q S M <br />TDS mg/L S Q S S S Q <br />TSS mg/L - - - 5 S Q <br />SAR - - - - - - Q <br />CALCIUM, dis. mg/L S Q S S S Q <br />MAGNESIUM, dis. mg/L S Q S S S Q <br />SODIUM, dis. mg/L S Q S S S Q <br />BICARBONATE mg/L (HCO~) S Q S S S Q <br />CARBONATE mg/L (COs) S Q 5 S S Q <br />SULPHATE mg/L S Q S S S Q <br />CADMIUM ug/L - - - S S Q <br />CADMIUM, dis. ug/L S Q S _ - <br />• <br />LEAD, dis. ug/L S Q S = <br />MERCURY ug/L - - - S S Q <br />MERCURY, dis. ug/L S Q S - - - <br />SELENIUM ug/L - - - S S Q <br />SELENIUM, dis. ug/L S Q S - - - <br />SILVER ug/L - - - S S Q <br />IRON ug/L - - - S S Q <br />IRON, dis. ug/L S Q S - - - <br />MANGANESE ug/L - - - S S Q <br />MANGANESE, dis. ug/L S Q S - - - <br />MOLYBDENUM ug/L - - - S S Q <br />MOLYBDENUM, dis. ug/L S Q S - - - <br />ZINC ug/L - - - S S Q <br />NITRATE & NITRITE mg/L (N) S Q S S S Q <br />AMMONIA, free mg/L (N) - Q S S S Q <br />PHOSPHATE, artha mg/L S Q S S S Q <br />S=Semiannually (either in April or May, and then in September or October) <br />Q=Quarterly <br />M=Monthly <br />Note: <br />(1) All (race metals are Total Recoverable <br />(2) AI time of annual survey, Row and field parameters are measured. If Bow <br />is greater Than 35 gpm, site is monitored per spoil spring plan. If less than <br />35 gpm, na further monitoring. <br />• <br />I: \Env ironmema I\A H R\?000\C YCCVa b les\$pec ie l a Is <br />