My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP01501
DRMS
>
Back File Migration
>
Report
>
REP01501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:31:54 PM
Creation date
11/26/2007 9:59:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Report
Doc Date
2/2/2001
Doc Name
2000 AHR LIST OF TABLES TO TABLE 24
Annual Report Year
2000
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• TABLE 1 (Continued) <br />HYDROLOGIC MONITORING SITES <br />SURFACE WATER SITES <br />SITE MONITORING FREQUENCY COMMENTS <br />Water Level or Water Quality <br />Flow & Field Sampling <br />Parameters <br />Foidel Creek <br />USGS 09243800 Monthly Quarterly (1) & (2) <br />I4 Monthly Quarterly (3) <br />8 Monthly Quarterly (1) & (2) <br />USGS 09243900 Monthly Quarterly (2) <br />Middle Creek <br />USGS 09243700 Monthly Quarterly (2) <br />Fish Creek <br />• <br />16 Monthly Quarterly (1) & (2) <br />302 Monthly Monthly During irrigation <br /> season only; (1) & (4) <br />1002 Monthly Quarterly (1) & (2) <br />Trout Creek <br />30] Monthly Monthly During irrigation <br />season only; (1) & (4) <br />69 Monthly Monthly During irrigation <br />season only; (1) & (4) <br />NOTES: <br />(1) Included with Twentymile Coal Company's hydrologic monitoring program. If site is removed from <br />iCC's program and continued monitoring is required, CYCC will monitor site. <br />(2) Sampling will be performed on a Bexible schedule throughout normal Bow period, March through <br />September. Within this time frame, flow and field parameters will be measured twelve times and (our <br />full suite analyses will be conducted. <br />(3) Monthly field samples when flowing; Four monthly lab samples obtained once runoff begins. <br />(4) First headgate of irrigation ditch downstream of mine discharge. Monitoring to begin once Fish Creek <br />Dewatering Facility is functioning. <br />• <br />I dEnvironmenlal\AH RQOOOICYCC\tables\Special.x Is <br />
The URL can be used to link to this page
Your browser does not support the video tag.