Laserfiche WebLink
Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year <br />2004 <br />West E1k.Mine C-80-007 IvfrYtn,ra;rr (na1 ~~,a,,.TL.L.C. <br />mine name permit # Permittee <br />Address: p g g~~ ~ql g~~set;, f8 83'13'F <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Cate o Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total' <br />Acres disturbed 310 18 328 <br />Acres backlilled and raded <br />Acres to soiled 29.73 1 . <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each cateaorv below. Do not include acres that have achieved final. Phase III release. <br /> Last Years <br /> Cumulative Thls Calendar Cumulative 10 years or Greater than <br /> Total ear Total' less 10 ears' <br />Acres seeded* N/A ~ <br />'include, if necessary, a description of any augmented see Ing or cultural practices <br />For the Entire Life of Mine the total number of acres disturbed '~~R and the total number of acres: <br />Phase I released ~A- Phase II released DT/A Phase III released N/A <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed ~~ <br />For Government Performance and Results Act <br />Acreage in long-tens mining or reclamation facilities s ~~R'_ fl <br />Acreage in active mining areas s ~v~ <br />t(exclude acres where Phase III release has been achieved) <br />' Includes haul and access roads; temporery dams and impoundments; permanent dams and Impoundments; diversion and <br />wllector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, slorege and wnsWction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; reilroads; wal wnveyors; refuse piles and <br />coal mine waste impoundments; head-of-hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and wal combustion by-products disposal areas). <br />' Includes pits, topsoil sbipped areas in advance of pits, and spoil not backfilled and graded <br />