Laserfiche WebLink
~. ~ 2 <br />ANNUAL REPORT <br />The haul road from the stockpile area to Highway 8 was repaved <br />during the early part of this year. <br />Dust control on the drilling operation has been converted from a <br />wet to a dry method, which is almost 100% effective and also <br />simplifies operations during winter. <br />Qur plans on operation, mining and reclamation remain as originally <br />submitted. <br />