Laserfiche WebLink
• }' •,•w• <br />' MINERAL5 PROGRAM <br />FEE SCHEDULES UNDER <br />HB 1175 <br />Appilcatiort Fee Schedule <br />110 (1) 5250 <br />110 {2) 875 <br />110 (7) (110 to 112 Conversion) 1,500 <br />111 625 <br />1i2 1,875 <br />ii2 Quarry 2,325 <br />112 w/Chemical or Themal Processing 3,100 <br />112 Amendments 1,654 <br />112 Revisions 150 <br />112 Temporary Cessation 100 <br />113 Prospecting 75 <br />ii9 Succession o1' Operators 100 <br />