My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP00372
DRMS
>
Back File Migration
>
Report
>
REP00372
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:29:17 PM
Creation date
11/26/2007 9:38:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
3/7/1989
Doc Name
1988 ANNUAL REPORT HENDERSON MINING PN 77-342
From
CLIMAX MOLYBDENUM CO
To
MLRB
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COSTS <br />Henderson Mine <br />February 1989 <br />Many affected areas are being revegetated, but are not ~:onsidered <br />totally reclaimed. Estimated costs and concomitant financial warranty for <br />such areas are adjusted downward as reclamation occurs and upward to cover <br />additional disturbed areas. Because of the continuously changing ~icreage and <br />status of affected land, the Board stipulated that reclamation costs be <br />updated every two years in conjunction with submittal of the annual report <br />and map. We have refined our acreage estimates, our methods, and our costs. <br />The estimated costs of reclaiming all anticipated disturbances through 1990 <br />is $4.298 million. <br />A. Site Type Cost Calculations: <br />1. Mine site (computed for 15 acres), mostly comprised of a fragmented <br />rock growth medium: <br />Site preparation <br />Spread and haul SS <br />Spread and haul WC <br />Stockpiling SS and WC <br />Seed <br />P 0 fertilizer <br />M~xSin SS and WC <br />4,500 trees <br />600 shrubs <br />Maintenance, fertilize, <br />one application <br /> Labor/ <br />Man-days Equipment Material Total <br />5 $ 3,750 $ 0 $ 3,750 <br />20 2,080 5,400 7,480 <br />30 3,120 7,800 10,920 <br />6 624 0 624 <br />2 208 1,410 1,618 <br />4 416 780 1,196 <br />6 624 0 624 <br />45 4,680 2,250 6,930 <br />6 624 390 1,014 <br />3 315 180 495 <br /> Total. .$ 34,651 <br />$ 2,310 <br />per acre <br />* SS = sewage sludge <br />WC =wood chips <br />
The URL can be used to link to this page
Your browser does not support the video tag.