My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP00257
DRMS
>
Back File Migration
>
Report
>
REP00257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:29:11 PM
Creation date
11/26/2007 9:36:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Report
Doc Date
6/23/2003
Doc Name
Cavity Characterization Plan
From
American Soda LLP
To
DMG
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 23, 1999 <br />/'a~~e 29 <br />• 5. Discontinue injection into the solution mining well and balance the density of [he <br />fluids in the well. <br />6. Pressure test all tubing, strings, and annular areas between well strings with <br />nitrogen gas to hydrostatic pressure to ensure [he mechanical integrity of the <br />tubing. <br />7. Perform a temperature log to determine if there is any significant temperature <br />change above the nahcolite-bearing zone. <br />8. Evaluate the results from these procedures to determine the best solution for <br />correcting the problem. The use of additional logging techniques may be required <br />to accurately pinpoint any mechanical failures. <br />9. Notify the BLM and EPA of the results of the evaluation and the proposed <br />corrective actions to be taken. <br />5.9.3 Process Monifariitg <br />If changes in physical parameters at the production stream indicate a formation failure, <br />• cavity breach, or production well breach, the BLM and EPA will be notified within the next BLM <br />working day and the following procedures will be initiated. <br />I. The well pressure, temperature, and flow rate instrumentation will be checked for <br />accuracy. <br />2. The well valves will be checked for possible leakage. <br />3. Injection into the solution mining well will be discontinued and the density of the <br />fluids in the well will be balanced. <br />4. All tubing, strings, and annular areas between well strings will be pressure tested <br />with nitrogen gas to hydrostatic pressure [o ensure the mechanical integrity of the <br />tubing. <br />5. A temperature log will be performed to determine if there is any significant <br />temperature change above the nahcolite-bearing zone. <br />6. The results from these procedures will be evaluated to determine the best solution <br />for correcting the problem. The use of additional logging techniques may be <br />required to accurately pinpoint any mechanical failures. <br />• 7. BLM and EPA will be notified of the results of the evaluation and the proposed <br />corrective actions to be taken. <br />Agapito Associates, luc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.