Laserfiche WebLink
• • Use of facilities <br />Reclamation <br />• Removal and Salvage of the facilities <br />• Grading and scarification of the area <br />• Install interim drainage control plan <br />• Topsoil Replacement <br />• Revegetation of the affected land f or use as an irrigated pasture. <br />• Removal of diversion structures and sedimentation pond following successful <br />revegetation. <br />Such practices will result in land use capabilities equal to or greater than those presently <br />found. The estimated cost of reclamation is shown is Exhibit ]0, Bond Calculation. A <br />reclamation timetable is provided on Table I A, Reclamation Time Table. <br />The anticipated final surface configuration of the loadout facilities area is shown on the <br />• Post-Disturbance Topography Map, (Map 10). <br />Loadout Facilities <br />At the conclusion of the loadout operations, all installed coal handling facilities will be <br />removed and all salvageable equipment will be sold as used equipment or to a local scrap <br />dealer. No equipment will be merely abandoned by TCC. <br />The only structures, which will remain after reclamation at the Terror Creek Site, will be <br />the same structures that were present prior to the area being affected by the <br />loadout facility. The siding tract, which is on railroad property, will be removed unless it <br />is sold to the Union Pacific Railroad. The structures will be the following: <br />. 2.05 - 7R <br />Rev. 6- 15-98 <br />Permit Renewal 3 <br />~~-17 <br />