My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139864
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139864
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:42:57 PM
Creation date
11/26/2007 9:04:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The design of the access road yard area is such that a coal truck <br />can turn around without backing up. Typically maintenance will be <br />performed only on unloaded trucks. However, on rare occasions, a <br />truck may break down with a load and therefore the access road <br />might be traveled by a loaded truck. <br />Coal Processing Waste and Non-Coal Processing Waste <br />TCC will be using only dry crushing and screening in preparation <br />for loadout; therefore, no waste products will result form the <br />operation. <br />Underground Development Waste <br />Since no coal will be mined at TCC, no underground development <br />waste will be produced. <br />Return of Coal Processing Waste to Abandoned Workings <br />Since coal will only be sized, no waste will result from the <br />operations of TCC. <br />• 2.05.4 Reclamation Plan <br />The reclamation objective of TCC will be to restore the surface <br />loadout area to the land use capability which will be equal to or <br />better than that which currently exists. The objective of all <br />reclamation practices will be to stabilize the soil by revegetation <br />and to restore the approximate pre-mining drainage configuration of <br />the area. In general the post disturbance appearance and <br />usefulness of the area will be similar to that present prior to the <br />disturbance of the area. <br />Final reclamation of the area disturbed by construction and use of <br />the facilities will be satisfied by the implementation of the <br />reclamation plan sequence described below. <br />Construction and Operation <br />> Removal and storage of the existing soil resources. <br />> Construction of the loadout facilities. <br />• 2.05 - 6R <br />Rev. 08-10-93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.