Laserfiche WebLink
<br /> <br />10. Stock piled materials are only allowed during the effective time <br />of the contract and must be removed prior to the expiration <br />date. <br />11. See attached Reclamation Plan (Exhibit D) for stipulations on <br />topsoil stockpiling, slopes (3:1) and rehab of site (seed, <br />fertilizer, and application). <br />12. Recontouring of site will occur after contract material has been <br />removed. Contours will be at a minimum of 25 foot intervals <br />along the slopes. See Attachment. <br />