Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />EXIiIBIT L -RECLAMATION COSTS <br />The estimated costs involved for the various phases of the <br />reclamation process discussed in Exhibit E - Reclamation PLan are <br />tabulated below: <br />Ite m <br />Finish grading <br />Placing soil <br />No, of Units <br />17.15 acres <br />Cost/Unit <br />$2178, 00 <br />Total Cost <br />$37, 353 <br />24, 216 <br />4, 116 <br />150 <br />6, 000 <br />16,144 cu. yd <br />Seed & Seeding 17.15 acres <br />Planting trees 300 <br />Drop structures 400 lire. ft <br />1.50 <br />240,00 <br />0.50 <br />15.00 <br />Rip rap 3000 tons 6.30 18, 900 <br />Total $90, 735 <br />For purposes of utilizing a floating surety on individual tracts in <br />the excavation area, a breakdown of the above total reclamation costs are <br />presented. <br />Washing PLant Area (Utilized the entire period of operation) <br />Finish grading 4. 00 acres @ $2, 178. 00 $8, 712 <br />P Lacing soil 3, 765 cu. yd. @ 1. 50 5, 648 <br />Seed & Seeding 4.00 acres @ 240,00 960 <br />Planting trees 100 @ 0. 50 50 <br />$15, 370 <br />Excavation Area <br />Tract #1 <br />Finish grading 2. 32 @ 2, 178. 00 5, 053 <br />Placing soli 2, 184 @ 1. 50 3, 276 <br />Seed & Seeding 2.32 @ 240,00 557 <br />Planting trees 58 @ 0. 50 29 <br />8,915 <br />