Laserfiche WebLink
Slormwnler Manaeemenl Plan 1226/97 <br />1.0 Introduction and Summary <br />Agile Stone Systems, Inc. ("Agile") has filed application to place its Parkdale Project into <br />production. The Parkdale project is 11 miles northwest of Canon City, Fremont County, <br />Colorado as shown on Figure l . Following construction, mining activities include <br />1) aggregate from the gravel bar, <br />2) granite from a quarry and <br />3) sandstone from a small quarry. <br />Mined material will be crushed andlor screened prior to shipment from the property. Most <br />shipments will be by rail. Project activities could contribute to the degradation of surface <br />water quality due to the addition of sediment. The purpose of the project's Mining Plan, <br />Reclamation Plan and Storm Water Management Plan ("SWMP") is stabilization of <br />disturbed areas from erosion and slope instability. Specific measures to be implemented <br />include: slope flattening; grading to route uncontaminated surface water around disturbed <br />areas; providing appropriate erosion protection against design floods; and placement of <br />reclamation cover to protect against erosion. <br />The project requires that Agile file a CDPS Application for Discharges Associated with <br />Sand and Gravel Production Operations for Stormwater and Process Water for the <br />project. A Stormwater Management Plan ("SWMP") must be prepared prior to <br />application for coverage under the General Permit. This document represents the SWMP <br />• for Agile's Parkdale Project. <br />1.1 Organization of SWMP <br />The SWMP is organized to include Administrative Information (Section 1), Common <br />Technical Information (Section 2), Site Specific Stabilization Plans (Section 3), and <br />Appendices (Section 4 ). <br />1.2 SWMP Administrator <br />The Agile representative responsible for the SWMP is: <br />Bill Fehr or Mitch Albert <br />Agile Stone Systems, Inc. <br />6435 Pontiac Court <br />Englewood, CO 801 ] 1 <br />Phone (303) 741-2556 Fax (303) 721-0293 <br />Agile's on-site representative responsible for the SWMP are those noted above until a site <br />supervisor is employed. The on-site representative will be named prior to any ground <br />disturbing activities. If a contract SWMP representative is engaged, their name, address <br />and phone number will be filed. <br />• <br />Pege 2 <br />