Laserfiche WebLink
PARTI <br />Page 12 <br />Permit No. COG-500000 <br />I'• MONITORING AND REPORTING <br />3. Reporting of Data -Prods Water tl;cr}s?.vers <br />A signed copy of the report forms outlined in paragraphs a sad b, below, shall be submitted to each of the following <br />addresses: <br />Colorado DepaRmmt of Healdt <br />Water Quality Control Division <br />WQt2D-PE-B2 <br />4300 (]terry CreeY Drive South <br />Drover, Colorado 80222-1530 <br />Ada: Permits sad Enforcement <br />U. S. Fnvironmental Protection Agency <br />Water Management Division <br />999 16th Stroet, Ste. 500 <br />Drover, Colorado 80?A2-2466 <br />Arta: NPDES Branch, 8WM-C <br />All reports required for submittal shall be signed sad certified for accuracy by the permitfee. (See Part I.D.10 of the <br />permit.) <br />a. Quarterly Report - Prnoavs Water <br />For facilities allowed to discharge process water, reporting of the data gathered in compliance with Part I.B.3.a <br />shall be on a quarterly ba®s. <br />Monitoring rnetrlfs obtained during the previous 3 months shall be summarired sad reported oa Division <br />approved Discharge Monitoring Report forms (DMRa), postmarked no later than the 28th day of the month <br />following the completed t:almdar quarter. For example, for the 1st quarter (January, February, and March) the <br />• quarterly report mrrat be received at this offix postmarked no later than Aprii 28. If no discloargc occurs during <br />the reporting period, 'No DierJtarge' shall be reported. <br />b. Antral Report -Process Water <br />For facilities not allowed to disrharge process water (see PaR I.B.3.b of the permit), a report on whether or not <br />a discharge of protxes water has taken place at the facility is required, is letter foray, oa as annual basis. The <br />report shall cover October 1 through September 30 of each year, sad will be due to the Division by the <br />following Odobtr 28, beginaiag with the first year or partial year of permit coverage. The Division reserves <br />the right the require additional information is the report, on a caso-by-case basis, as aeaded. <br />4. .Reporting of Data - Stormwater DkssbAmas <br />a. Annual Report - SWMP <br />The permittee will be required to submit m aaaual report, covering January 1 through December 31 of each <br />year, on the overall compliance with the SWMP. The annual report will contain. at a minimum: <br />1) Name of permittee, address, phone number, and permit certification number. <br />2) A report on the facility's overall compliance with the SWMP. <br />3) A summary of each comprehensive atormwater facility inspection made, including date, findings, and <br />action taken. <br />. 4) Results sad interpretation of any stormwater mopitoring performed. <br />The amtual report will be due to the Division on or before February 15 of each year, after the first full year of <br />coverage under the permit. The exact due date for the permittee's first annual report will be listed in they <br />permit certification. In no case will as annual report be due before February 15, 1994, unless specifically <br />