Laserfiche WebLink
INDIRECT COST <br /> @ 12.6°/a of Direct (1.55%Liability Insurance, 1.05%Performance Bond 10.00%Profit) $3,127 <br /> RECLAMATION PROJECT CONTRACT (Direct& indirect Cost) Subtotal $27,946 <br /> D.M.G. ADMINISTRATIVE COST @.5.00°/u of Contract $1,397 <br /> PERFORMANCE WARRANTY Total 529,343 <br /> 27 <br />