Laserfiche WebLink
RECLAMATION COSTS EXHIBIT L. <br /> [Rules&Reps§6.4.121 <br /> CONSTRUCTION MATERIAL PERMIT N2 M 2001. .......... <br /> REGULAR 112 OPERATION <br /> " WEIMER ONE GRAVEL" <br /> January 2001 <br /> Case I <br /> Assuming Initial Phase in Progress/Essentially Complete <br /> (Initial Financial Warranty) <br /> DIRECT COST <br /> JOB JOB EQUIPMENT A JOB DE CRIPTION JOB <br /> LOCATION HAUL DISTANCE QUANTITY <br /> O South& Cat 633 Scraper @$0.411/CY EARTHWORK—Headwall Slope $8,860 <br /> West Average haul = 500ft Reduction Back-fill <br /> Highwalls Source: N-Central stockpile&NW 1,350ft a 20ft a 40ft+ 2+27ft'BCY x <br /> disposal bench 1.09 Swell Factor a 21,800LCY <br /> ® North Cat D-8N Bulldozer @$0.158/CY EARTHWORK—Headwall Slope $1,579 <br /> Highwall Average haul= 15ft Reduction Dozing <br /> Source=Cut&Fill Dozing 1,100ft x 15ft x 30ft+2+27ft'BCY x <br /> 1.09 Swell Factor 7 9,992LCY <br /> • Initial Exc., Cat D-8N Bulldozer @$0.115/CY EARTHWORK— Rip-loosen High- $1,184 <br /> Disposal Emb., Average rip depth= 1 ft Traffic(flat bench)areas <br /> Process, and Areas= 3.364+[0.646+ 2]+ 1.015+ <br /> Stockpile Flat 1.680(respectively)=6.38 Ac 6.38Ac x 43,560ft'/Ac x 1 ft+27ft'/BCY <br /> Areas a 10,293CY <br /> O Initial Exc. Cat 633 Scraper @$0.41 I/CY EARTHWORK—Spread Soil(on emb . $1,484 <br /> &Disposal Average haul=500ft &headwall slope-banks only) <br /> Emb., and Source: Soil stockpiles @ N&W site <br /> process/ Boundaries 4.107Ac x 43,560ft2/Ac x 'hft+ <br /> Stockpile Areas=[2,500ft+ 1,500ft] x 44.72ft+ 27ft'/13CY x 1.09 Swell Factor a 3,611LCY <br /> Slopebanks 43 560ft`/Ac=4.107Ac <br /> • All Areas RE-VEGETATION—Fertilize, Seed,& $8,402 <br /> Disturbed Mulch <br /> (flats&slopes) 0 Grass-drill,Tractor, Straw-blower, <br /> &Crimper @$671.10/Ac 6.380Ac x$671.IQ=$4,282 6.38Ac <br /> ® Broadcast-seeder, Straw-blower,& + <br /> Crimper @$ 1,003.28/Ac 4.107Ac x$1,003.28=$4,120 4.107Ac <br /> West Labor, Equipment& Materials CONSTRUCTIO —Fencing $2,128 <br /> Bound $2.09/LF Replace/Relocate -str barb-wire fence 1 018-ft <br /> DIRECT COSTS sub-total $23 637 <br /> MOBILIZATION 5% $1,182 <br /> ToTAL DIRECT COST $24 819 <br /> Continued, NEXT PAGE <br /> 26 <br />