0 <br /> (3.1.12 ) Signs & Markers (1) Entrance sign, & (2) boundary markers — to be placed <br /> as required <br /> d) Topsoiling and Reseeding are addressed above in (c) {3.1.9) & (3.1.10), <br /> respectively. <br /> e) RECLAMATION SCHEDULE <br /> PHASE/AREA ACTIVITY TIMEFRAME <br /> INITIAL PHASE/ <br /> South-Central Stock- Transfer overburden stockpile to worked-out west Prior to spring-2001 <br /> pile—0.8 acre excavation resumption of <br /> excavation activities <br /> 5.5/1.5 ac Strip & stockpile topsoil from excavation areas & Prior to spring-2001 <br /> NW depression disposal area resumption of <br /> excavation activities <br /> N-Wall(940'x 17.5'x 2)= Place stripped overburden to reduce slope of <br /> 0.7611.50 ac completed steep excavated headwalls, excess to On-going, w/spring- <br /> NW disposal depression. 2001 to Yr-2003 <br /> completed south and <br /> west excavation <br /> headwalls <br /> SECONDARY PHASE/ <br /> 5.16/1.50 ac Strip & stockpile topsoil from excavation areas & Prior to spring-2003 <br /> more of the NW disposal area resource excavation <br /> W-wan(650 x 17.5 x 2)= Place stripped overburden to reduce slope of Prior to spring-2003 <br /> 0.52/1.50 ac completed steep excavated headwalls, excess to resource excavation <br /> NW disposal depression <br /> North Central Stock- Transfer pre-existing overburden stockpile to Prior to Year-2005 <br /> pile — 1 ac disposal NW depression or to backfill steep completion of the <br /> excavated headwalls final east 430 feet of <br /> Secondary Exc. <br /> TERTIERY PHASE <br /> 5.14/1.5 ac Strip & stockpile topsoil from excavation areas & Prior to spring-2006 <br /> more of the NW disposal area resource excavation <br /> NW disposal Place stripped overburden to reduce slope of Prior to spring-2006 <br /> depressionl.5 ac completed steep excavated headwalls, excess to resource excavation <br /> NW disposal depression <br /> RESTORATION Topsoil 2:1 headwall slope-banks FollowingYr-2009 <br /> PHASE depletion of all permit <br /> area sand & gravel <br /> resources <br /> Topsoil Flat pit floor bench(s) Upon Yr-2008-2009± <br /> removal of all product <br /> stockpiles <br /> Fertilize, seed, & mulch all disturbed, topsoiled July Yr-2009+ <br /> areas <br /> 1R <br />