My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139611
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139611
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:42:47 PM
Creation date
11/26/2007 8:47:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
APPENDIX P EMERGENCY RESPONSE PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />hydrogen peroxide is used on site, care will be taken to maintain <br />a reliable source. <br />If alkaline chlorination is used, it will be necessary to <br />' maintain elevated pH levels (8-11} for the reaction to occur. In <br />addition, cyanogen chloride gas can be generated. This gas is highly <br />toxic and care will be taken to keep the area well ventilated. <br />Alkaline chlorination can be accomplished using beads or by making <br />' an aqueous solution. Monitoring of chlorine levels will occur during <br />use of this method to ensure that solutions with potentially toxic <br />chlorine levels are not released. <br />9.2 Soill Monitoring <br />' In the event of an accident, spill, or leak which has the <br />potential to migrate from the point of occurrence spill monitoring <br />will be implemented. The exact nature and extent of the monitoring <br />plan will be determined by the nature of the spill and the potential <br />hazards created by the spill. The Mill Superintendent or senior staff <br />- member present at the time of the spill will determine appropriate <br />,~ spill monitoring. <br />' The potential for spills of fuel, oil, coolants, or ANFO to <br />migrate from the point of occurrence is minimal. These materials will <br />be quickly absorbed into soil material. If a spill of these materials <br />occurs with the potential of a path of surface water, absorbent booms <br />will be placed at the point of entry and surface water monitoring <br />will be implemented downstream. <br />The potential for spills of mill reagents migrating from the <br />point of occurrence is also minimal. All mill reagents will be used <br />' and stored in the mill area. The mill is designed for collection and <br />containment of all spills. <br />t.J <br />' -l~ (Revised 4/20/89} <br />
The URL can be used to link to this page
Your browser does not support the video tag.