My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139580
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:42:46 PM
Creation date
11/26/2007 8:46:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987026
IBM Index Class Name
Permit File
Doc Date
2/25/1987
Doc Name
FN M-87-026 BLACK OBSIDIAN PIT ADEQUACY ITEMS
From
MLRD
To
COLO QUARRIES INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
... <br />Colorado Quarries, Inc. <br />Black Obsidian Pit <br />File No. M-87-026 <br />February 25, 1987 <br />Adequacy Items Continues <br />Page 3 <br /> <br />Exhibit D -Reclamation Plan <br /> <br />1. As part of Exhibit B - Site Description, you submitted a letter from the <br />Soil Conservation Service which included plans for reclamation. We <br />assume that this letter should be Exhibit D, and that you plan to adhere <br />to this plan, if that is incorrect, please describe how your plans <br />differ from the S.C.S. recommendations. The plan appears satifactory to <br />us. <br />2. When reclamation is complete, will the pit areas drain water downhill, <br />or will they be left as internally draining basins or lakes? The staff <br />recommends that the pits be left open at the downhill portions so that <br />snowmelt and storm water can drain away. <br />Exhibit E - Mining and Reclamation <br />1. Please show the names of all adjacent landowners and which direction <br />from the affected area their land occurs. <br />2. Please indicate the approximate topographic contours or the general <br />direction of the natural slopes. <br />3. Please provide to scale a visible, locatable, and permanent reference <br />point on the map. This could be a survey corner, road intersection, <br />house or other building, or other structure which will help locate the <br />site. <br />Financial Warrant"y <br />The maximum amount of financial warranty fora Limited Impact Operation is <br />E5, 000.00. If you wish to commit to a 55,000.00 financial warranty, then you <br />do not need to provide an estimate of reclamation costs. If you want to post <br />a uncial warranty in a lesser amount, then you must provide an estimate of <br />the actual costs to reclaim the site based on what: it would cost an <br />independent contractor to complete reclamation. 1"his should include unit <br />costs for the following activities as appropriate to the operation: <br />backfilling, grading, topsoil application, seeding, mulching, fertilization, <br />and labor. <br />Thank you for contacting our office. If you have any questions or need <br />assistance, please contact me. <br />cc: Ed Bischoff, Mineral Program Supervisor <br />/b do <br />7736E <br />
The URL can be used to link to this page
Your browser does not support the video tag.