Laserfiche WebLink
CIRCES Cost Estimatinct Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 022 <br />Date : 02/16/2006 <br />User : GRM <br />Agency or organization name : DMG <br />Permit or other job action :Initial bond Calculations - 2006 <br />Task description : Cut h/ghw2ll to 3:1 slope <br />HOURLY EQUIPMENT COST <br />Permitfjob# : M-2005-075 <br />Abbreviation :none <br />Filename : M075-02a <br />Basic machine :Cat DSR Series 11- 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank riooer <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 20, 833 <br />State :Colorado <br />County :Garfield <br />Site :Glen Pit <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Ownership cosUhour : $48.82 NA <br />Operating cosUhour : $66.09 100 <br />Rrpperop. cost/hour : $1.78 25 <br />Operator cosUhour : $31.78 NA <br />Total unit cosUhour : $148.47 Total fleet cosUhour : $148.47 <br /> <br />Swell Loose <br />BCY factor : 1.120 volume : 23,333 LCY <br />Source of estimated volume :Phase 5 linear feet (600) cut to 3:1 slope <br />Source of estimated swell factor :program <br />HOURLY PRODUCTION Job Condition Correction Fact <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 16.50 % (neg) <br />Average site altitude : 5,320 feet <br />Material weight : 3,250 IbsiLCY <br />Weight description <br />Grave! - Pitrun <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.404 /LCY <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.36 <br />Altitude : 1.00 <br />Material weight : 0.71 <br />Blade type : 1.00 <br />Net correction : 0.43 <br />Source <br />(Cat <br />(Cat HB) <br />Adjusted unit production : 36735 LCY/hr <br />Adjusted fleet production : 367.35 LCY/hr <br />Total job time : 63.52 Hours <br />Total job cost : $9,430 <br />