Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />{No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhr/fleet <br />-Centrifugal pump, CPB No. 200M $56.72 2 $113.43 $113.43 <br />-Flatbed Truck, 4x2, 30K GVW $52.44 1 $52.44 $52.44 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $165.88 $165.88 <br />sheet 2 of 2 <br />,. <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transoortation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) = 0.11 <br />Retum time (hours) = 0.11 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 1.22 <br />JOB TIME AND COST <br />Rifle <br />5.0 miles <br />45.0 mph <br />0.11 Total non-roadable mob/demob cost' : $642.17 <br />0.11 'two round trips with haul rig <br />NA Total roadable mob/demob cost *" : $36.86 <br />NA "one round trip, no haul rig <br />0.22 <br /> Total job time : 2.44 hours <br /> Total job cost : $679 <br />