Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : DMG <br />Task # : 08a State :Colorado PermiUjob # : M-2005-075 <br />Date :02/17/2006 County : Ganleld Abbreviation :none <br />User: GRM Site :Glen Pit Filename :M075-08a <br />Permit or other job action : Initial Bond Calculations-2006 <br />Task description : lh%fial IilObll%Z8f10/1 f0 S/fe <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6z4, diesel powered, 400 HP <br />Truck trailer description : Genedc folding gooseneck, drop deck equipment trailer (257, 507, and 1007) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $23.32 $25.78 $31.45 <br /> OperatingcosUhour: $30.29 $31.74 $35.14 <br /> Operator cosUhour : $27.40 $27.40 $27.40 <br /> HelpercosUhour: $0.00 $25.15 $25.15 <br /> Total Unit CosfJhour : $81.01 $110.07 $119.13 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhr/Fleet DOT permit <br />CosUfleet <br />-Cat D8R Series 11- SSU 52.55 $48.82 $119.13 1 $167.95 $119.13 $0.00 <br />-reveg tractor 10.00 $20.00 $81.01 1 $101.01 $81.01 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $268.96 $200.14 $0.00 <br />