Laserfiche WebLink
<br /> EXHIBIT D (Cont'd) <br /> MP~1 believes it is in compliance with federal and state <br /> laws and regulations governing water and water rights. There <br /> is no application of the river dredge law or siltation <br /> structure removal requirement. <br />1 <br /> Mining Timetable. The operator estimates a steady and <br />' fairly constant market over the next thirteen years. <br /> Estimates are for 950,000 tons of material annually during <br /> t <br />T <br />i <br />i <br />b <br /> ween <br />he depos <br />t var <br />es <br />e <br />the period 1981 through 1994. <br />' 9,600 and 120,000 tons per acre and averages approximately <br /> 64,800 tons per acre. At the rate of 64,800 tons per acre, <br />' approximately 15.4 acres per year will be excavated from an <br /> average deposit thickness of 27 feet. The three-year stages <br />1 ill <br />ff <br /> w <br />a <br />ect somewhat more than 15.4 acres because the slope <br />' areas around the perimeter will contain less than 64,800 tons <br /> of material, and there are perimeter areas in each stage <br />' which will not be mined. An estimated mining timetable is <br /> shown on the next page. Comparison of the timetable with <br />1 E <br />hibit D <br />1 <br />ill <br />h <br />h <br />h <br />i <br />b <br />h <br /> map <br />x <br />- <br />w <br />s <br />ow w <br />ere t <br />e operat <br />on <br />egan, w <br />ere <br />' it is going and an estimate of how long it will take. <br />1 <br /> <br />1 <br />1 <br />13 <br />