My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139347
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:40:10 PM
Creation date
11/26/2007 8:35:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
MR-9 to MR-13
Section_Exhibit Name
EXHIBIT 15 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 4. Regrade Drill Sites <br />No. of sites: 3 <br />Size of sites: 4,000 sq ft. <br />Dozer or backhoe cost: 560/hr <br />Time required: 2 hrs/site <br />Equipment and Labor Costs: <br />3 sites x 560/hr x 2hr/site = 5360.00 <br />5. Regrade Drill Trails <br />Total length of drill trails: 2,300 + 2,800 <br />+ 100 = 5,200 ft. <br />All trails on moderate slopes <br />Dozer or backhoe cost: $60/hr <br />Time required: 1 hr/500 ft <br />Equipment and Labor Costs: <br />5,200 ft of trail - SOOft/hr x 560/hr = 5624.00 <br />6. Reseeding Drill Sites and Trails <br />Revegetation: 5250/acre <br />Disturbed acreage: <br />Drill sites: 3 x 100ft x 40ft/43,560 = 0.28 Ac. <br />Drill trails: 5,200ft x 20ft wide/43,560 = 2.39 Ac. <br />Total Acreage: 2.67 <br />Revetation costs: <br />2.67 acres x 5250/acre = $667.00 <br />7. Mobilization Cost <br />Assume: 1.5 hr. mobilization time from Florence/Canon City <br />area <br />Backhoe: $60/hr x 1.Shrs = $90.00 <br />Dozer: S60/hr x 1.Shrs = 590.00 <br />Rig: 5100/hr x 1.Shrs = 5150.00 <br />Subtotal: 5330.00 <br />Reclamation Total Cost: $3,967.00 <br />. Round To: 54,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.