My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139347
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:40:10 PM
Creation date
11/26/2007 8:35:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
MR-9 to MR-13
Section_Exhibit Name
EXHIBIT 15 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Bonding Calculations <br />Energy Fuels Coal, Inc. <br />Southfield Mine <br />1987 Exploration and Development Drilling Project <br />1. Sealing Drill Holes <br />Total number of drill holes: 3 <br />Drill hole diameter: 6 inches (B-1, CC-54A) <br />10 inches (R-1) <br />Total drilled footage: 1,850 feet <br />Gallons of fluid per linear foot: 1.5 (6 inch) <br />4.1 (10 inch) <br />Cost of cement seal material: 50.60/ft (6 inch) <br />51:64/ft (10 inch) <br />Assume: Drill holes B-1 anc CC-54A require Soft. column of <br />cement seal to plug aquifers. Drill hole R-1 will be steel <br />cased and grouted, .requiring only a surface plug. <br />Materials costs: <br />Cement: 2 holes x Soft x S0.60/ft 560.00 <br />Abandonment fluid: 1,410ft - (2 x SOft) - (2 x loft) <br />• x l.Sgal/ft x 50.10/gal = $194.00 <br />Labor and Equipment <br />Rig, water truck and 3 man crew: <br />5100/hr x 4hrs/hole x 2 holes = $800.00 <br />Water: S20/load x 2 loads/hole x 2 holes = 580.00 <br />Subtotal: S1,134.00 <br />2. Plugging Drill Holes <br />Materials costs: <br />Octo-plugs: S2/ea x 3 holes = 56.00 <br />Cement: $12/bag x 3 holes = 536.00 <br />Labor Costs: 3 holes x 2 man-hrs/hole x 515./hr $90.00 <br />Subtotal: $132.00 z <br />3. Backfill Mud Pits <br />No. of Pits: 3 holes x 2pits/hole = 6 <br />Dozer or Backhce cost: S60/hr <br />• Equipment and Labor Costs: <br />Dozer or eackhoe @ S60/hr x 6 pits x 2hr/pit 5720.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.