My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-07-18_PERMIT FILE - M1974052 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1974052
>
1985-07-18_PERMIT FILE - M1974052 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 6:39:54 PM
Creation date
11/26/2007 8:25:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974052
IBM Index Class Name
Permit File
Doc Date
7/18/1985
Doc Name
VARRA COMPANIES INC AMENDMENT FN M-74-52
From
RINDAHL & ASSOCIATES
To
MLRD
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. David Berry <br /> July 18, 1985 <br /> Page Two <br /> The final end land use will be ponds with vegetated <br /> shorelines. Enclosed is a revised application form to this <br /> effect. <br /> The final end land use is not to be considered wildlife <br /> use or habitat. Landowner does not want to tempt trepasser <br /> hunting on his land. Establishing ponds is the only feasible <br /> reclamation plan due to the high water table and lack of <br /> overburden. <br /> 5. Cottonwood trees within the 100 foot setback of the St. Vrain <br /> Creek should not be affected by the dewatering operation. To <br /> insure no damage occurs, the setback area will be flood <br /> 1 irrigated when mining comes within 100 fe t of the proposed <br /> pond shoreline or 200 feet from the . Vrain Creek. <br /> \� Discharged water from the dewatering operation will be <br /> piped or transported by other means to the setback area. <br /> Continuous or periodic watering will take place while mining <br /> within 100 feet of the setback area. In either case, water <br /> will be available to the root systems through flood <br /> irrigating to insure the dewatering operation does not <br /> deplete the available water to the root system. <br /> The 100 foot setback from St. Vrain Creek will remain <br /> undisturbed during watering, with the exception of minimal <br /> disturbance near the shoreline, mainly during reclamation, as <br /> stated. <br /> 6. Irregular shaped shorelines will be maximized and the mining <br /> and reclamation plan maps approximate the irregularities and <br /> shorelines to be established. Available overburden may be <br /> used to create shoals. <br /> If you have any questions, please contact us. Thank you for <br /> your continued cooperation. <br /> Sincerely, <br /> RINDAHL & ASSOATES, INC. <br /> Heide�¢ G <br /> Director of Natural Resources <br /> HH/jd/56 <br /> Enclosures <br /> File No. 85-0304 <br /> cc: Varra Companies, Inc. <br /> t <br /> .er..�lel� --�___ •,�A�;.ie..:�y.?....msv.,� ..aflCi �.:_�_ _��":i..;� .:�C. _ mL�>Fi .. __-�:�_ _ _ .i': <br />
The URL can be used to link to this page
Your browser does not support the video tag.