Laserfiche WebLink
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />CIRGES Cost Estimating Software <br />Agency or organization name : DRMS <br />001 State :Colorado <br />03/05/2007 <br />DEG <br />Permit or otherjob action :New 112(C) Permit <br />Task description : R@glad@ $If@ <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper :Cat 633E Sedes 2 (2001) <br />-Push dozer :NA <br />Support equipment -Load area :NA <br />-Dump area : NA <br />Road maintenance -Motor grader ~ NA <br />-Water truck :Water Tanker, 2, 500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape/1 NA NA NA NA miscUuk <br />Utilization-machine : 100 NA NA NA NA 100 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour : $81.70 NA NA NA NA $7.50 <br />OperatingcosUhour: $118.08 NA NA NA NA $14.66 <br />Ripper op.cosUhour: NA NA NA NA NA NA <br />OperatorcosUhour: $32.96 NA NA NA NA $34.24 <br />Unit subtotals : $232.75 NA NA NA NA $56.40 <br />Number of units : 1 0 0 0 D 1 <br />Group subtotals : Work : $232.75 Support : $0.00 Maintenance : $56.40 <br />Total work team cosUhour : 6289.15 <br />,,: ,.: <br />:: .. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 10,000 CCY factor: 1.125 volume: 11,250 LCY <br />County :Pueblo <br />Site :Big "G"Gravel Pit <br />PermiUjob # : M-2006-081 <br />Abbreviation :none <br />Filename :M081-001 <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />