Laserfiche WebLink
Agency or organization name : DRMS <br /> Permit or job action :New 112 (c) Permit <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Regrade Site scraper( 1 25.8 $7,488 <br />002 -Replace Topsoil dozer 1 55.1 $9,274 <br />003 -Revegetate Disturbed Land revege 1 40.0 $18,778 <br />004 -Mob/Demobilize mobilize 1 3.3 $1,585 <br />•inGudes inflation (actor adjustrnent of: NA <br />SUBTOTALS <br />TOTAL DIRECT COST <br />OVERHFJID AND PROFIT - Liability InSUfanCe : 2.02 % O/ dlfeCf total = <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : 3.00 % of direct NA total = <br />Profit : 10.00 % o/direct total = <br />$35,121 <br />$35,121 <br />$709 <br />$369 <br />$1,054 <br />$3, 512 <br />TOTAL O 8 P = $5.644 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (Direct+08P)= $40,765 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $2,038 <br />CONTINGENCY- NA' NA total= NA <br />'contingencies accounted for at task level TOTAL INDIRECT COST = $$,182 <br />TOTAL BOND AMOUNT (direct i indirect) = 543,303 <br />