Laserfiche WebLink
1 ~~ ~~ <br />EXHIBIT C - MINING PLAN CONTINUED) <br />6. THE SIGNIFICANT DISTURBANCES WILL BE THE PIT AREA AND <br />THE STORAGE AREAS WHICH WILL TOTAL APPROXIMATELY ~ ACRES. <br />SEE EXHIBIT 'E') <br />~. THE MINE ACCESS WILL BE ON THE EXISTING ACCESS~OAD, <br />WHICH WILL NOT BE SUBSTANUALLY UPGRADED FOR THE MI E <br />OPERATION.~NOTE THAT THIS ROAD WAS DEVELOPED FOR T~E PURPOSE <br />OF MINING THE EXISTING GRAVEL PIT. THE ROAD IS OW ED BY THE <br />BL~1 AND IS BEING USED FOR LAND MANAGEMENT PURPOSES.) <br />H. THERE DOES NOT APPEAR TO BE A NEED TO PRODUCE WASHED <br />SAND AND GRAVEL IN THE WORKING AREA OF THE REFUGE PIT N0. <br />1.THE OPERATOR DOES NOT ANTICIPATE THE NEED FOR WATER USES <br />OR IMPOUNDMENTS. IF WATER USES ARE NEEDED IN THE FUTURE THE <br />OPERATOR WILL FILE A TECHNICAL REVISION PRIOR TO ANY WATER <br />USE OR DEVELOPMENT. <br />9. THE AFFECTED AREA IS ON A DRY ALLUVIAL BENCH. NO WATER <br />WILL BE INTERCEPTED, GROUND WATER OR SURFACE WATER. THERE <br />WILL BE NO CHEMICAL TREATMENT SYSTEMS ON THIS PROJECT SITE. <br />lO. THE OPERATOR HAS NO PLANS TO USE, OR APPROPRIATE ANY <br />UNAPPROPRIATED GROUND WATER OR SURFACE WATER. NONE WILL BE <br />INTERCEPTED OR STORED. <br />11. THE PRIMARY USE FOR THE PRODUCTS OF THIS MINE IS TO <br />PROVIDE MOFFAT COUNTY WITH THE MATERIALS NECESSARY TO <br />CONSTRUCT AND MAINTAIN THE COUNTY ROAD SYSTEM IN THE <br />NORTHWESTERN PORTION OF THE COUNTY. THE PRODUCTS WILL BE <br />SIZED, SORTED, CRUSHED, MIXED, STOCKPILED AND REMOVED WITH <br />STANDARD OPERATIONAL EQUIPMENT WHICH WILL INCLUDE S YARD <br />FRONT END LOADERS, CRAWLER TRACTORS, BACKHOE, SCREENING AND <br />CRUSHING PLANTS, CONVEYORS,TRUCKS AND OTHER SUPPORTING <br />EQUIPMENT. <br />1Z. THE GREEN RIVER IS A PERENNIAL STREAM APPROXIMATELY i <br />MILE TO THE SOUTHWEST OF THE AFFECTED AREA. THE PLANNED <br />EXCAVATIONS, AND THE RECLAMATION, WILL BE PREFORMED IN A <br />MANNER THAT WILL PREVENT THE DEGRADATION OF THE DRAINAGE <br />CHANNELS WITHIN THE ADJOINING PROPERTY. <br />13. No STOCKPONDS ARE PLANNED FOR THE PROJECT. <br />14. THE OPERATOR WILL FENCE THE MINING, RECLAMATION AND THE <br />STOCKPILE AREAS TO EXCLUDE LIVESTOCK. THE FENCE WILL BE <br />CONSTRUCTED OF 3 STRAND BARBED WIRE WITH SUPPORTS EVERY 1Z <br />FEET. <br />