~ ~ •• •• <br />EXHIBIT C - MINING PLAN <br />1. THE PURPOSE OF THIS PERMIT APPLICATION IS TO HAVE <br />AVAILABLE TO THE APPLICANT, AND /OR HIS ASSIGNS, A DEPOSIT OF, <br />SAND, GRAVEL AND OTHER MATERIAL FOR ROAD CONSTRUCTION <br />PURPOSES IN THE VICINITY OF THE REFUGE FIT N0. 1. THE <br />BEGINNING DATE OF THE DEVELOPMENT WILL BE JANUARY, 1990. <br />BECAUSE OF THE UNCERTAIN DEMAND FOR THIS MATERIAL, AND <br />THE ECONOMIC FACTORS, THIS MINE WILL PROBABLY BE WORKED <br />INTERMITTENTLY. IT IS THE APPLICANT'S BEST GUESS THAT THE <br />MINING WILL END IN THE YEAR ZOOO ACCORDING TO CURRENT <br />PROJECTIONS. <br />Z. THE TOPSOIL HAS BEEN DESTROYED IN THE EASTERN ~ OF THE <br />AFFECTED AREA AND IS NOT AVAILABLE FOR RECLAMATION. THERE IS <br />ONLY SPARSE VEGETATION IN THE WESTERN i OF THE AFFECTED <br />AREA. THE OPERATOR WILL REMOVE AND STORE AN AVERAGE OF S" OF <br />THE SURFACE AREA INTENDED FOR DISTURBANCE. A SIGN WILL BE <br />POSTED THAT WILL STATE THAT THE MATERIAL IS FOR RECLAMATION <br />PURPOSES. ALL SOILS WILL BE STORED IN THE AREA DESIGNATED ON <br />EXHIBIT 'E'. <br />WHEN IS PRACTICAL FOR THE OPERATOR TO GRADE AND <br />REAPPLY THE TOPSOIL IMMEDIATELY AFTER SALVAGE HE PLANS TO <br />DO S0, HOWEVER, WITH THE NATURE OF THE NEED AND USE FOR <br />THESE MATERIALS, THERE WILL BE EXTENDED PERIODS OF TIME THAT <br />THE EXPOSED EXCAVATIONS WILL HAVE TO REMAIN OPEN. IN THESE <br />INSTANCES, THE TOPSOIL WILL BE STORED IN THE AREAS <br />DESIGNATED ON EXHIBIT 'E'. THE OPERATOR WILL STABILIZE THE <br />TOPSOIL STOCKPILES BY SEEDING THEM TO PERENNIAL NATIVE <br />WESTERN WHEAT GRASS BROADCAST AT THE RATE OF O.5 POUNDS OF <br />PURE LIVE SEED PER lOOO SO. FT. OF AREA. <br />THE SITES SELECTED FOR STOCKPILE STORAGE WILL BE OUT OF <br />THE WAY OF MINE TRAFFIC, STREAM CHANNELS AND DRAINAGEWAYS. <br />3. THE PRIMARY PRODUCT WILL BE GRAVEL AND SAND. THESE <br />MATERIALS ARE OVERLAIN BY A SANDY CLAY MATERIAL THAT WILL <br />AVERAGE LESS THAN Z FEET IN THICKNESS. IT IS PLANNED TO USE <br />THIS CLAY WITH OTHER MATERIAL TO PREPARE ROAD BASE PRODUCTS. <br />FOR THAT REASON THERE WILL BE LITTLE, IF ANY, OVERBURDEN TO <br />DEAL WITH. <br />4. THE COMBINED THICKNESS OF THE CLAY AND GRAVEL DEPOSIT <br />MINED WILL BE A MAXIMUM OF ZS FEET ON THE SOUTHERN PORTION <br />OF THE PIT AND AN ESTIMATED LS FEET ON THE NORTHERN PORTION. <br />S. THE MAJOR COMPONENTS OF THE MINE ARE THE PIT AREA AND <br />THE PRODUCT/TOPSOIL AREAS IN THE NORTHWEST PORTION OF THE <br />AFFECTED AREA. IT CAN BE ASSUMED THAT THE PRODUCTS STORAGE <br />AREA WILL BE MINED OUT AT SOME POINT IN TIME DURING THE LIFE <br />OF THE MINE. <br />