Laserfiche WebLink
SEP-15-2004-WED. 10:09 AM BLGg LAW FIRM FAX IIo,3)3 413 1003 P,OOE <br />SEP-15-2004 bki~42 Lafearye Metro Land 303 65~ ~~ ~'•~ <br />.. ,::~~. <br />~' ; <br />.,. <br />billing. Uud« no clrcumstanoes shall Ditch Company be responsible or held liable for <br />damages to the Irrstallatiaas rc5ulting from maintenance or repair of the Installations- <br />7.4. For the purposes of ~ 73 an emergency is de$ned as: a) a situation that impacts <br />the ability of zhe Ditch Company to take delivery of water when suela water is legally <br />availab]e under the 12ws of the State o£ Colorado; or b) as a situation that becorttes ]mown <br />that presestts an immediate threat to the public health or safety. <br />7.5. Lal'ntgc shall art all times during the Warranty Period maintain, vuith the Ditch <br />Company the naztze, address and telephone number ofpeople who shall be responsible for <br />ltdCrlliug the maintenance responsibilities set forth in this Agreement The initial <br />responsible people will be then following: <br />Lafarge: <br />Lafarge West, lnc. <br />do Eric Reckentine <br />140D W, 64'~ Avenue <br />Denver, CO 80221 <br />303-657-4330 <br />7.6. Lafarge shall place no additional structures other than the Ditch and the Ditch's <br />appurtenant facilities shown is the Plans attached as EX'HIBTI D wlthia the Ditch <br />Maintenance Easement without the llitch Company's prior written approval. <br />earoe~ar~aaty+ <br />8. IIVSPECTION- <br />.•. <br />.; ....,...__.8:1__-Yafatge~ba~rrio'tifyDitcl-Company_atleastfive-(33-days-priarto~eoratnencing the .. .. .-;;. <br />initial construoiton of the instaUattons. );afarge shall notify Ditili Company at Least: TiviS~ <br />(5) days prior to coxtrmencin$ construction of arty replacement or repair of the • <br />Installations permitted by this Agreement, exceptfor emergency n=pairs provided fbr im ~ <br />7.3 and 7.4 of this Agreement. ~ • <br />8.2, pitch Compsn~y is pemitted to inspect the Installations or teplacement and repairs , <br />of the Installations d~rring and after construction. Ditch Company's tight to inspect the <br />Installations or the replacement of the lnetallatians in no way relieves Lafarge of its <br />liability for improper construction or maintenance. Ditch Company's inspection is solely <br />for the benefit of Ditch Company and aeates no obligation to Lafarge or nay third. party. <br /> <br />FIDOEUNE^nsr~11L7M1toCAl.rftm~alGdroTFSO,tmH6azs8ZOOe <br />4 <br /> <br />.~ <br />' i <br />• ,I <br /> <br />