My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-06-15_PERMIT FILE - M2000002
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2000002
>
2000-06-15_PERMIT FILE - M2000002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 12:51:04 PM
Creation date
11/26/2007 7:55:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000002
IBM Index Class Name
Permit File
Doc Date
6/15/2000
Doc Name
TANABE PIT APPLICATION FOR REGULAR 112 CONSTRUCTION MATERIALS OPERATION RECLAMATION PERMIT
From
COMMERCE CITY DEPARTMENT OF PUBLIC WORKS
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ iii iiiiiiiiuiiiiii , <br />COMMERCE CITY <br />Depnr~nientofPubl/c Works <br />June 15, 2000 <br />-~~t;F•1~1~! <br />Thomas A. Schreiner ~Ui~' - .; ).ODU <br />Environmental Protection Specialist <br />Division of Minerals and Geology, Room 215 ~` ~•.:,c.ior;piin2rals8Geolog~ <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Tanabe Pit Application for Regular (112) Construction Materials <br />Operation Reclamation Permit <br />Dear Tom: <br />The City of Commerce City objects to the Tanabe Permit Application on <br />the grounds that the impacts to First Creek are not addressed as <br />required under the following section of CRS: <br />34-32.5-116 Duties of operators -reclamation plans. <br />(4) Reclamation Plans and their implementation are <br />required on all affected lands and shall conform to the <br />following requirements: <br />(h) Disturbances to the prevailing hydrologic <br />balance of the affected land and of the <br />surrounding area and to the quality and <br />quantity of water in surface and groundwater <br />systems, both during and after the mining <br />operation and during reclamation, shall be <br />minimized. Nothing in this paragraph (h) <br />shall be construed to allow the operator to <br />avoid compliance with other statutory <br />provisions governing well permits and <br />augmentation requirements and replacement <br />plans when applicable. <br />According to the ALTA survey provided by the applicant, the southern <br />and eastern portions of Parcel B are located within the First Creek <br />floodplain limits. The information provided does not address how the <br />floodplain will be maintained during operations or restored after mining <br />has been completed. We are concerned with the potential for flooding <br />
The URL can be used to link to this page
Your browser does not support the video tag.