Laserfiche WebLink
<br />Colorado Division of Miners Ls and Geology sheet 1 of 2 <br />ESTIMATING FORM - EGUI PNENT XOBI LIZATION / DEMOBILIZATION <br />Task M... 6 Prep. by BLP Filename..x219-6 <br />Date..... 22-Jul-96 Permit q X-96-219 Mine......COttonwood Land <br />---"------- ^------' -----'----"--'- <br />Permit Action........ not <br />Task Description..... mobilization/demobilization <br />XOURLY EGU[PMENT COST <br />_________________ ___ NOTE - This is a list to select from, not a list of mandatory items to include. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 lb GVY, 375 HP, diesel powered <br />-Lt. Trailer ZS ton folding gooseneck, drop deck <br />-Med. Trai Ler 50 ton fo Lding gooseneck, drop deck <br />-HVy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />-Hyd. Crane Grove RT580 rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boom <br />-Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck : 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 20,000 lb GVN, 175 HP, diesel powered <br />Last Update: __________.._______________________________________________ _________________ ________~ <br />Decenber, 1994 <br />--------------- Lt. Rig Ned.Rig Hvy.R ig Pi Lo[ Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. <br />_______________________________ 26-50 T. > 50 T. Car Crane Truck <br />__________________________________________________________ Truck <br />_________________ Truck <br />__________ <br />_______________________________ <br />Ownership Cost/hr = f27.E8 __________________________________________________________ <br />f31.23 f38.36 (1.81 (19.89 (6.95 _________________ <br />512.79 __________ <br />f5.71 <br />Operating Cost/hr = (26.84 (29.29 534.27 (5.12 E23.40 (18.53 (24.52 58.00 <br />Operator Cost/hr = (21.40 (22.03 (22.03 (21.24 520.86 521.24 f21.24 (21.24 <br />Helper Cost/hr = 520.60 521.24 521.24 50.00 50.00 50.00 f0.00 50.00 <br />Total = (96.72 (103.79 5115.90 528.17 (64.15 f46.72 f58.55 (34.95 <br />NON-ROADABLE EDUIPNENT; <br />---------------------- Height Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Nachine Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />Ca[ D7H <br />f35.68 <br />-------------------------------------------------------------------------------------------------------------------- <br />-------------------------------------------------------------------------------------------------------------------- <br />Subtotals 50.00 (0.00 50.00 <br />