Laserfiche WebLink
<br /> <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHNORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ iask Destri ption ~ Cost (f) <br />Subtotal (H): <br />1. EARTHYORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost {f) <br />________I__________________________„_________._____________I____________ <br />Subtotal (1); <br />J. EARTH40RK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Dest ri ption ~ Cost (S) <br />_____...I__________________________________________________I..____~~~ <br />5 ~ redistribute topsoil on drillpads, mudpi is 8 ecce~ 536,483 <br />Subtotal (J): 536,483 <br />