Laserfiche WebLink
POWDERHORN COAL COMPANY <br />' Table 13.1 <br />Permit Area Building and Structure Inventory <br />• <br />• <br />ROADSIDE SOUTH -PORTAL & SURFACE FACILITIES <br />Building or Structure Construction <br />Date Description <br />Office # 1 1975 Mine administration ohices 4block building) <br />Office #2 1979 Safety Department offices (mobile trailers) <br />Showerhouse 1975 Showerhouse and lockerroom lacilities (block building) <br />$hop 1975 9000 sq. h. shop (metal building) <br />Warehouse 1980 3600 sq. h. warehouse (metal building) <br />Lab 197$ Coal leb testing facility (wood building) <br />.Ti/n1111/I~Ndll'R,"` 1981 2600 sq. h. (metal building) <br />Preparation Plant 1977 300 TPH preparation plant (steel structure) <br />Raw Coal Conveyor 1976 42" conveyor from Roadside Mine <br />Sediment Pond #8 1979 See Section 2.05.3(4) for detail <br />Refuse Disposal Area 1977 Refer to section z.o5.3 ror detail <br />Parking Lot #1 1978 Asphalt paved parking lot (100 parking spaces) <br />Parking Lot #2 1978 Asphalt paved parking lot (19 parking spaces) <br />Fan (Removed) 1978 (1963) e' diameter exhausting tan. Podal sealed t 7/94. <br />Storage Yard 1978 Storage yard for rack dust, timber and other mine supplies <br />HflUI ROad 1 1977 tl8 mile coal haul road, 1'h" gravel base <br />ACCESS Road 1 1975 0.4 mile access road, asphah road <br />Light-USe Road 1 1977 mile light-use road, for aceess to substations ~~/3,,,; ~~ <br />Water Tank 1977 40,000 gal. water lank for storage of mine water <br />~~ - ~ ~~ <br />