Laserfiche WebLink
• <br />• <br />C ~ <br />J <br />POWDERHORN COAL COMPANY <br />Table 13-1 <br />Permit Area Building and Structure Inventory <br />ROADSIDE NORTH -PORTAL & SURFACE FACILITIES Continued <br />Building or Structure Construction Description <br /> Date <br />Cap Magazine 1977 3.3'x3.3'x3.3' precast concrete box with steel <br /> door <br />Fuel Island 1997 42'x11'x6" concrete pad with 1000 and 6000 <br /> gallon surhace tanks <br />Bermed Fuel Tank 1996 5000 gallon fuel tank installed within a dirt <br /> benned spill containment area. The berms area <br /> will be approximately 15'x25'x2' inside and will be <br /> lined with an impervious geotextile liner covered <br /> with gravel. <br />Screening 8 Crushing 1995 Structural steel building 20'x32'x40' high to house <br /> a raw coal sizing screen and a coal crusher <br />Truck Loadout System 1995 One 36"x120' long conveyors that ocnvey coal to <br /> one new 50 ton truck loadout bin and one <br /> relocated 50 ton Yuck loadout bin all of steel <br /> construction,approximatedimensions of both <br /> bins 18'x13'x30' high <br />Sampling System 1995 Coal quality sampling system consisting of a <br /> sweep arm sampler mounted on the 36" <br /> conveyors and a self~ontianed sampling system <br /> building 8'x8'x20' long <br />High Ash Coal Conveyor and 1997 42"x67' long belt that extends from the raw coal <br />Stacker Tube stacking tube to a 10' diameter by 42' high <br /> stacking tube <br />T13-1-2 (Rev. 11/17/97) <br />