Laserfiche WebLink
iLnry Cable fads Inc. T1~40B <br />January 22, 1998 <br />i <br />i <br />Tony Waldron <br />Division oFMinerals and Geology <br />I would like to support the protest file number M-97-086, Bedrock Mine #1 <br />Stone because of the following reasons. <br />1. The natural wetlands located in Peck Canyon would be destroyed <br />2. The petroglyphs that aze located in Peck Canyon would be endangered <br />3. The blasting is occurring without adequate regard for human safety. An <br />would be the incident involving a school bus full of children that was th <br />the blasting on January 20, 1998. <br />4. Mr. Muller has not displayed that lte can be trusted to adhere to the guid <br />agreements with the state, county local residents and landowners. Specii <br />Muller has mined beyond the boundaries for which he was authorized tc <br />October 11, 1997 Mr. Muller sent a letter of official notification of his it <br />land owned by me. I requested to meet with him and his son. His son v <br />meet with us. Mr. Muller explained that there was no need for me to be <br />letter was just procedure that he was required to follow. I made a mists! <br />what he said to me. He was dishonest with me directly regarding the fol <br />issues: <br />• He told me that he was retiring at the end of December 1997 and th <br />would takeover the business. <br />• He told me that the letter that I received from him contained a typo <br />with mention of the date that his mining contract expired; the letter <br />he told me this should be 2001 <br />He also told me that I would need to meet with his son after the sno <br />May or June, because he wouldn't be involved in doing any rock re <br />the end of September and his son would be rururing the business by <br />• Mr. Muller explained to me that the rock removal was nothing to bl <br />about because if he did any removal at all it would be a small amotr <br />Siloam <br />by <br />dines of his <br />icafly, Mr. <br />mine. On <br />tent to mine <br />as unable to <br />alarmed, the <br />e in trusting <br />his son <br />tphical error <br />id 2100, and <br />season, in <br />oval after <br />en. <br />oncerned <br />overalong <br />period of time. <br />• Mr. Muller explained to me that the reclamation petntit authorized h rn to return <br />the area that he had been mining clay into it's original, pristine state In fact, the <br />permit allowed him to expand his operation. <br />Please take my issues into consideration as you meet today regarding Mr. 2v(uller's future <br />mining permits and authorization. <br />i. <br />Sincer y~ ~~ <br />Thomas P. Miller <br />3028 Vaughn View Drive, Box 7 <br />Pueblo, CO.81005 <br />719 540-8160 <br />P.01 <br />