Laserfiche WebLink
1 <br /> ' and areas in which structures, facilities, equipment, machines, tools, or <br /> other materials or properties which result from or are used in the mining <br /> operation are situated. <br /> Minor Disturbance: That area of a mining operation which is under- <br /> going preparation immediately prior to planting or seeding, is being planted <br /> or seeded, or has been planted or seeded and has not been released from bond <br /> upon full completion of all reclamation requirements as set forth in the <br /> permits. <br /> ' The expected timetable for the mining operation and the amount of land <br /> ' disturbed at any point in the mining operation (using the definitions <br /> above) is found in the following table. This table assumes that the mining <br /> operation will be of an intermediate duration, that is, 15 to 16 years <br /> ' as discussed in a previous section. The timetable phasing schedule, and <br /> degree of distuhnce anticipated is as follows: (see next page) <br /> 1 <br /> 1 <br /> 1 <br /> -19- <br />