My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_PERMIT FILE - M1999089
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1999089
>
_PERMIT FILE - M1999089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2020 3:25:58 PM
Creation date
11/26/2007 7:31:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999089
IBM Index Class Name
Permit File
Doc Name
BYRON & LALANI WEATHERS WEATHERS MINE 1 110 CONSTRUCTION MATERIALS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN EXHIBIT C <br /> we will use the upper 25 feet of material. when mining ends the <br /> floor will be leveled and reseeded using the seedmix shown in the <br /> vegetation information on page 5 . <br /> We expect to remove the upper 25 feet of the deposit. This <br /> site has three layers of material. The upper layer is 8 to 12 <br /> inches of topsoil; the second layer is a 24 to 45 inch thick <br /> layer of whitish clay suitable for pond lining material and the <br /> last is a deep deposit of silty gravely sand that is usable for <br /> dressing roads and as structural fill. o.,z <br /> As noted in the soils and vegetation section there 1-9,_8 to <br /> 12 inches of very sandy topsoil on the site. When encountered it <br /> will be stripped and stockpiled around the perimeter of on the <br /> floor of the site for use in reclamation. If the soil stockpiles <br /> remain undisturbed for more than one growing season� a cover crop✓ <br /> of Western Wheatgrass will be planted at a rate of 3 .0 pls/200 <br /> Ft2. <br /> The entrance to this site will be from an existing road used <br /> for internal access between the irrigated fieldy This road is <br /> our primary access to this field and it will remain when mining <br /> is complete. The northern part of this road is not included in <br /> the permit because it is an existing road that will remain when <br /> reclamation is complete. Periodic grading will be necessary to <br /> keep the road in its present condition and to make it passable. <br /> On-site equipment may include, but is not limited toe a <br /> motor grader, front-end loaders, motor scrapers, a dozer, convey- <br /> ors, a screening plant, dump trucks and a water truck. Final <br /> processing may be done offsite depending on the need at a partic- <br /> ular project site. <br /> Little or no water will be used at the site. This material <br /> is very sandy and we do not plan to wash it. If dust control <br /> water is use it will be obtained from sources we have available <br /> and approved for that use. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.