Laserfiche WebLink
LIST OF TABLES <br /> (Continued) <br />• <br /> Table No. Page <br /> 17-17a Summary of Projected Impacts to Downstream Irrigated Crops <br /> on Sage Creek 42a <br /> 17-17b Summary of Crop Reduction Variables For Moderately Sensitive Crop Species 42a <br /> 17-17c Crop Reduction Estimates For Salinity Tolerant Crop Species 42c <br /> 17-18 Pre-and Postmining Geomorphic and Channel Parameters in <br /> Subwatershed Disturbed 6y Mining 44 <br /> 17-19 Subwatersheds and Corresponding Areas, Reclaimed Percentages <br /> and Receiving Structures 51 <br /> 17-20 Curve Numbers, K Factors, C•P Factors, S and L Factors Used <br /> for the Postmining Pond 010 Watershed Model 54 <br /> 17-21 Summary of Probable Hydrologic Consequences of the First <br /> Five-Year Mine Plan for the Yoast Mine 58 <br />LIST OF EXHIBITS <br />Exhibit No. <br />• 17-1 Mining Induced Drawdowns in the Overburden and Wadge <br />Coal Aquifers <br />LIST OF ATTACHMENTS <br />Attachment No. <br />17-1 SEDCAD' Postmining Model Input/Output Tables -Pond 010 <br />17-2 Input Data for Pit Inflow Model Runs <br />17-3 Input Data and Computations for PitPumpage Drawdown Radii <br />17-4 Pit Pumpage Impact Calculations and Assumptions <br />17-5 Assumptions, Values, and Calculations Used to Assess Water <br />Quality Impacts from Resaturated Spoil Discharges <br /> <br />iii Revised 9199 <br />