Laserfiche WebLink
• TABLE OF CONTENTS <br /> (Continued) <br /> Page <br /> Effects of Runoff from Reclaimed Areas on Quality of Streamflou 55 <br /> Summary 57 <br /> References Ci ted 63 <br /> LIST OF TABLES <br /> Table No. Page <br /> 17-1 Summary of Aquifer Characteristics 3 <br /> 17-2 Annual Pit Inflow Volumes for the Wadge Overburden Aquifer 4 <br /> 17-3 Annual Pit Inflow Volumes for the Wadge Coal Aquifer 4 <br /> 17-4 Annual Pit Inflow Volumes for the Wolf Creek Overburden Aquifer 5 <br /> 17-5 Annual Pit Inflow Volumes for the Wolf Creek Coal Aquifer 5 <br /> 17-b Summary of Calculated Pit Pumpage Rates and Estimated 1- and <br /> STOOL Drawdown Distances 10 <br /> 17-7 Acid Base Potential of Wadge Overburden Cores - Yoast Mine 19 <br />• 17-8 Wadge Overburden Core Paste pH (<7) Summary - Yoast Mine 20 <br /> 17.9 Summary of Particle Size Percentages for Yoast and <br /> Seneca II Wadge Overburden Cores 22 <br /> 17.10 Weighted Average Chemical Characteristics of the Wadge <br /> Overburden by Sample Site, Yoast Permit Area 23 <br /> 17-11 Weighted Average Chemical Characteristics of the Wadge <br /> Overburden by Sample Site, Seneca II Nine 24 <br /> 17-12 Spoil Influenced and Background Water Chemistry in the <br /> Seneca 11 Overburden Aquifer 29 <br /> 17-13 Statistical Summary of Seneca II Spoil Water Chemistry 30 <br /> 17-14 Major lon Chemical Summary of Downgradient USGS Bedrock <br /> Wells 31 <br /> 17-15 Projected Ranges of Major lon Concentrations in Yoas[ <br /> Sediment Pond Discharges of Spoil Water 33 <br /> 17-16 Irrigation Season Monthly Volumes of Spoil Discharge <br /> Through 004 Pond from 1984 Through 1993 35 <br />• 17-17 Values Used and Calculated for the Yoast First Five-year <br />Xinin <br />Block Pit Area a <br />il R <br />n <br />ff Vol <br />th <br />June <br />d S <br />f <br /> g <br />n <br />po <br />u <br />o <br />umes <br />or <br />e <br /> Through September Irrigation Season 38 <br />ii Revised 03/24/95 <br />