Laserfiche WebLink
<br />EXHIBIT D <br />R&CLAMATION PLAN <br />PROPOSED SCHOOLFIELD PIT <br />The reclamation will begin with the completion of the first phase <br />of mining. It is estimated the first phase will be under active mining <br />for approximately 5 years. <br />Grading will be done as the mining proceeds to the west and final <br />grading will take place at the end of the first phase. <br />The slopes will be left at 3:1 and top soil will be replaced to <br />a depth of 6" - 12". <br />Due to the water table depth and distance to surface water (approx. <br />1J2 mile), there will be minimal, if any, effect on water quality in the <br />area. Colorado water laws will be complied with. <br />Top-soil will be stored in a berm away from the mining operation. <br />If left for more than a year, the stock-pile will be revegetated <br />(see ExhibiC C). <br />Revegetation in conjuction with reclamation of the site will be <br />accomplished according to the ASC recommendations (see Exhibit D). <br />There will be no buildings or structures placed for this operation. <br />