Laserfiche WebLink
<br />EXHIBIT C <br /> <br />PROPOSED SCHOOLFIELD PIT <br />There will be no storage of hazardous materials or chemicals on site. <br />Equipment will be refueled on a daily or as needed basis by pumping from <br />a fuel truck. <br />Front end loaders and dozers will be used to do the main excavation. <br />The gravel will be processed on site by the use of a screen and / or <br />crusher. There is no anticipated need for a chemical surfactant in the <br />processes. There will be minimal if any effects to the hydrological <br />balance of the area or surroundings. There will be no off-site damage, <br />slopes will be confined to 3 to 1 or less so that stable configuration <br />will remain for the proposed future land use. <br />It is entirely possible that heavy snows and severe weather will close <br />operations for 6 months at a time and it is felt that this permit should <br />not be required to file a formal notice of cessation in these cases. <br />- 2 - <br />