Laserfiche WebLink
t~CLAN(ATiON TINI~TABLE <br />LJ <br />• <br />• <br />Task <br /># Description Time Needed <br />months <br />1 Backfill slopes in Area 1 pit from 2H:1 V to 3H:1 V using overburden <br />from Area 1 mining and overburden from Area 2. 4 <br />2 For Areas 2,3,4,5, move overburden to reclaim previous areas and <br />create land pads. Ongoing reseeding and mulching of these strips. 211 <br />3 Use overburden placed in the bottom of previous areas and stockpile <br />to backfill the final area land peninsula and slopes. Total of 144,000 <br />cubic yazds 2 <br />4 Use topsoil from stockpile to place in Pad 5 Area and azea of facili- <br />ties. Total of 21,618 cubic yards. .5 <br />5 Move all portable equipment offsite. 0.2 <br />6 Regrade sediment pond. 0.2 <br />7 Ripping or harrowing of any needed areas. (20.1 acres) 0.2 <br />8 Reseed and mulch all recently seeded azeas (20.1 acres) 0.2 <br /> <br /> Total Time 218.3 <br />Note that the above reclamation timetable is somewhat different from the mining timetable. <br />7. POST-RECLAMATION SITE DRAINAGE <br />The entire permit area will drain to the lake after reclamation, as shown on Map F. <br />15 Road Pit 10/02 <br />29 <br />