My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE138109
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE138109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:43 PM
Creation date
11/26/2007 7:02:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986123
IBM Index Class Name
Permit File
Doc Date
9/2/1986
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Areas 1 end 2 ere to be reclaimed as ponds. Sideslopes on the ponds will be <br />held to a maximum of 3:1 to 10 feet below the waterline end a maximum of <br />2:1 below that depth. Areas above the waterline wilt be covered with a <br />minimum of 6' of topsoil. The banks of the ponds wilt be reseeded down to <br />the waterline. The following seed mixture, which was recommended by the <br />local Soil Conservation Service office will be used: <br />Thickspike wheetgross {Critana) 5.5• PLS/Ac. <br />Side-oats groma (Vaughn) 2.25• PLS/Ac. <br />Switchgross (Nebr. 28) 1.125• PLS/Ac. <br />8.875• PLS/Ac. <br />At the request of the property owner, overburden and topsoil will be spread <br />along the western perimeter of the owner's property in the area indicated on <br />Exhibit'F'. Grading in this area will direct drainage generally to the <br />northeast. The slope will be less then 5~. There will be a minmum of 6' of <br />topsoil spread over the entire fill area. This area will be reseeded with the <br />above seed mixture, unless the owner decides to plant a crop. <br />Approximately i2.7 acres will be reclaimed. Approximately 10.1 acres of <br />this total may be planted as a crop by the owner, in which case only 2.6 <br />acres will need to be reseeded. The rest of the oroe will be in either ponds <br />or will not have been disturbed by the mining operations. Surface acreage <br />end depths of the ponds are shown on Exhibit 'F'. <br />Reclamation of the site will be done sequentially. Area 1 reclamation will <br />start when extraction begins to Area 2, end so art. It is anticipated that <br />total reclamation of any particuier area will rtot take longer then two years <br />to accomplish. <br />
The URL can be used to link to this page
Your browser does not support the video tag.