Laserfiche WebLink
<br />Estimated Reclamation Cost Per Item <br />1) Grass Seed Mix <br />2) Drilling Grass Seed <br /> <br />Total Reclamation Cost for This Project <br />Unit Unit Total Total <br />Cost Name Units Cost <br />$39.83 AC <br />17.50 AC <br />Subtotal <br />40 $1,593.20 <br />40 700.00 <br />$2,293.20 <br />25% failure & replant 573.30 <br />SEED TOTAL $2,866.50 <br />3) Topsoiling W/Dozer or Front-End Loader 0.75 CY 32,400 24,] 80.00 <br />4) Disking 28.50 AC 40 1,140.00 <br />5) Fertilizer-40#/A Available N&P 22.00 AC 40 880.00 <br />6) Fertilizer Application 12.50 AC 40 500.00 <br />7) 4000 Ibs/A Grass Hay or Straw Mulch 170.00 AC 40 6,800.00 <br />8) Spread and Crimp Mulch 49.00 AC 40 1,960.00 <br />9) Weed Control 26.00 AC 40 1,040.00 <br />0) Backsloping N/A Pit fl oor will day light to existing co ntours <br />11) Mobilization Cost 1,500.00 LS ] 1.500.00 <br />Total Construction Cost...... <br />Indirect Cost <br />0.185 <br />Subtotal -Construction Cost <br />5% DMG Administration Expenses <br />Rounded To ................................................. <br />HARTMAN PIT <br />....... $40,866.50 <br />7.560.31 <br />$48,426.81 <br />2.421.34 <br />$50,587.44 <br />...... $ 50,590 <br />