Laserfiche WebLink
<br />3.7 Equlpaeat Hob. + Demob. 99.10 <br />3.8 Total Grading 8 Compaction costs 2,916 <br />4. Fill Portals <br />Both portals at the Hubbard Creek fan <br />site have been fficktilled. <br />5. Seal Portals <br />Both Portale at the Hubffird Creek tan <br />site have been saeled. <br />6. Reclamation including seeding. mulching, <br />fertilizing. and scaritving. <br />6.1 AuaDar of Disturbed !eras 3.3' <br />6.2 Coat per lore ;1,933 <br />6.3 Reclamation Coat ;6,979 <br />• <br />TASK 73 <br />PAGE 2/3 <br />• <br />