Laserfiche WebLink
SASR 73 <br /> BIIBBARD CRESS FAH AR 2A PAGE 1/3 <br /> 1. <br /> area <br /> Dmolitioa Pope Gait Cont Total Coet <br /> <br /> Metal Building 0 .14/SF p <br /> Concrete Portal 172 Cu. Sd. #59.81/Cu. 2d. 10,287 <br /> Concrete Boast Pad 65 Cu. Sd. 41.25 Ft. 1 2,681 <br /> Concrete Substation Pad 32 Cu. Sd. 41.25 Ft. 1 1x320 <br /> Total Dmolitioa Costa 14,288 <br /> 2. Culvert Rmoval <br /> 2.1 Pill to be !loved 811 ou, yd. <br /> 2.2 Praduotion Bate 112 ou, yds./br. <br /> 2.3 Job Eftloienoy Factor .90 <br />• 2.4 Het Prodaotioa Rate 101 cu. yds./hr. <br /> 2.5 Time 8equired to Ezcavats 8 hrs. <br /> 2.6 Operating Coat per Sour #64 <br /> 2.T Equipment Hob + DmoD. 0 <br /> 2.8 Cost to Remove Culvert #510 <br /> 3• Grading and Comaantion <br /> 3.1 7olnse of Material (1.T5 avell factor) 8,475 cu. yds. <br /> 3.2 Prodnotioa Rate - Cat D6 Dozer 338 cu. yds./hr. <br /> 3.3 Job Effioiemy Faotcr .90 <br /> 3.3.1 Operator Effioleacy Factor .90 <br /> 3.4 Het Produotioa,Aats 274 ou. yds./hr. <br /> 3.5 Time Required 31 hrs. <br />• 3.6 Operating Cost Der Hour #91 <br />