Laserfiche WebLink
• NEi_JOB-HOURS- ESTIMATING-FORM cont'd sheet 2 of 6 <br /> TASK ~ ~ TASK ~ EDU IPMENT ~ CPM ~ MET <br /> NUMBER ~ iASK ,::72: ",;;~ ~ +CLeJ ~ i:5"cD ~ CHARTING ~ JOB HOURS <br /> e..e.ecvv...I =======e.e..e.cc.=e.eee ce.......eeeee.v. .ceeeeevvlev .vve=e=vel eeseeeee. _le==.eeeeev.Ieeoeee=...eee <br /> 46 ~ Remove Sanborn Creek Mine Vate^ Settling Pond ~ 3.4' ~ Ca[ DEN ~ ---•----->~ 1.71 <br /> 47 ~ Remove Sanborn Ck Ditches (CD-1,2,3, 4,5, CD-A) ~ 4.41 ~ Cat DBN ~ -----••-->~ 2,21 <br /> 48 ~ Remove Sewage Leach Field ~ 1.93 ~ Cat DBN ~ ---•----->~ 0.97 <br /> 49 ~ Regrade Pond A ~ 2.10 ~ Cat 08N ~ --------->~ 1.05 <br /> 50 ~ Regrade Pond B ~ 70.96 ~ Cat DBN ~ --------->~ 35.48 <br /> 51 ~ Regrade Pond D ~ 116.34 ~ Cat D8M ~ --------•>~ 58.17 <br /> ~ <br />54 ~ ~ <br />Replace Topsoil from Stockpile to Previously Dish ~ <br />2.08 ~ ~ <br />CAT 637E ~ ~ <br />2.08 ~ <br />0.00 <br /> 55 ~ Replace Topsoil from Stockpile to Sanborn Creek a~ 14.92 ~ CAT 637E ~ 14.92 ~ 0.00 <br /> 56 ~ Replace Topsoil from Stockpile to East Refuse Ares 5.90 ~ CAT 637E ~ 5.9 ~ 0.00 <br /> 57 ~ Replace Topsoil tram Stockpile to Yest Valley Fill 31.92 ~ CAT 637E ~ 31.92 ~ 0.00 <br /> 58 ~ Replace Topsoil from Stockpile Substation No. 3 ~ 9.14 ~ CAT DBN ~ --•-•-•-->~ 4.57 <br /> 59 ~ Replace Topsoil from Stockpile to Elk [reek Mine ~ 22.64 ~ CAT 637E ~ 22.64 ~ 0.00 <br /> ~ <br />62 ~ ~ <br />Install bulkhead Seals and Backfill Mine Entries ~ ~ <br />150.00 ~ ~ <br />Misc. ~ ~ <br />150 ~ <br />0.00 <br /> 63 ~ Seel end Plug Degas Yells ~ 8.00 ~ Drill Rig ~ 8 ~ 0.00 <br /> 64 ~ Seal and Plug Drill Holes ~ 32.00 ~ Drill Rig ~ 32 ~ 0.00 <br /> 65 ~ Seal Borehole for Substation No. 3 ~ 8.00 ~ Drill Rig ~ 8 ~ 0.00 <br /> ~ <br />68 ~ ~ <br />Broadcast Seed Steeper Areas ~ ~ <br />144.60 ~ ~ <br />Reveg Equip ~ <br />--------->~ <br />144.60 <br /> 69 ~ Drill Seed Flat Areas ~ 44.40 ~ Reveg Equip -------•->~ 44.40 <br /> 73 ~ Regrade Primary Riprep Borrow Area ~ 44.75 ~ CAT DBN ~ -•---•--->~ 22.38 <br />• 74 ~ Regrade Secondary Riprap BorroN Area ~ 113.36 ~ CAT DBN ~ ----•---->~ 56.68 <br /> 75 ~ Remove Gravel }ram substation Mo. 3 to Sediment P~ 1.94 ~ CAT DBN ~ --------->~ 0.97 <br /> 80 ~ Mobilize/Demobilize Equipment for Initial Reclame~ 10.00 ~ TK/Trailer -•------->~ 10.00 <br /> 81 ~ Nobilixe/Demobilize Equipment for Pond Removal ~ 7.33 ~ TK/Trai(er~ --------->~ 7.33 <br /> 82 ~ Mobi Lixe/Demobilize Equipment for Site Naintenanc~ 12.67 ~ TK/Trailer --------->~ 12.67 <br /> 90a ~ Demolish and Remove All Structures ~ 200.00 ~ Misc. ~ 200 ~ 0.00 <br /> 906 ~ Demolish and Remove All Structures ~ 200.00 ~ Misc. ~ 200 ~ 0.00 <br /> 90c ~ Demolish and Remove All Structures ~ 200.00 ~ Misc. ~ 200 ~ - 0.00 <br /> 90d ~ Demolish and Remove All Structures ~ 200.00 ~ Xiso. ~ 200 ~ 0.00 <br /> 92 ~ Yearly Site Maintenance ~ 400.00 ~ CAT D3C ~ --------->~ 100.00 <br /> ~ <br />94 ~ ~ <br />Pond Cleaning ~ ~ <br />80.00 ~ ~ <br />Dredger ~ ~ <br />-•----•-->~ <br />20.00 <br /> <br />100 ~ <br /> <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ ~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ ~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ ~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ ~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />. TOTAL TASK HOURS - p. 2: 2=142.80- NET PROJECT HOURS- p.2: -___ 523_19_ <br />